2014, 10th February, HOPS electrification train at Ollerton
This collection are all of the concrete batching consist, which is seen at Ollerton, concreting the stanchion bases.
Read More5 / 12
140210-040 Hops Concrete batching consist, seen busy concreting stanchion bases at Ollerton on the High Marnham Test Track. Nearest is MPV 99 70 9131 006-7, followed by KFA wagon 008-3 which is equipped with the concrete mixing bowl and the cement silo, next is KFA wagon 009-1 with the aggregate storage and delivery system, and last is MPV 010-9 which has the staff facilities and water storage tank. There should be a Falcon wagon (for the spoil removed from digging the bases) in the consist, there is a wagon from the existing fleet at Tuxford, being prepared for use with the ensemble so could emerge renumbered as 006-7, if for permanent use.